IGNACORE has successfully completed the installation and commissioning of a 375kW / 783kWh Battery Energy Storage System (BESS) at Master Simex Paper Industry, delivering a reliable and intelligent energy storage solution for industrial power management.
Designed to support the demanding energy requirements of a paper manufacturing facility, the large-scale ESS provides dependable backup power, improved energy efficiency, and enhanced power continuity for critical industrial operations.
Project Highlights
- System Capacity: 375kW Power Output
- Energy Storage Capacity: 783kWh
- Application: Industrial Energy Storage & Backup
- Client: Master Simex Paper Industry
- System Type: Battery Energy Storage System (BESS)
- Installation: Successfully Completed & Commissioned
Reliable Power for Industrial Operations
Paper manufacturing facilities require stable and continuous electricity to maintain production, machinery, control systems, and other essential operations. The IGNACORE ESS was implemented to provide a dependable energy storage solution capable of supporting the facility during power interruptions and improving overall energy management.
With 375kW of power capacity and 783kWh of energy storage, the system provides substantial backup capability while helping the facility manage its electrical loads more efficiently.
IGNACORE’s Industrial BESS Expertise
This project demonstrates IGNACORE’s capability to deliver large-scale Battery Energy Storage Systems for industrial applications. From system planning and equipment integration to installation, commissioning, and final deployment, the project was completed with a focus on reliability, safety, and long-term performance.
The successful deployment at Master Simex Paper Industry further strengthens IGNACORE’s growing portfolio of industrial and commercial energy storage projects across Bangladesh.
Project Impact
The 375kW / 783kWh ESS installation enables Master Simex Paper Industry to:
- Maintain greater power continuity during grid interruptions
- Support critical industrial loads with stored energy
- Improve overall energy management
- Reduce dependency on conventional backup power solutions
- Enhance operational reliability
- Build a more resilient and efficient power infrastructure
Powering Industry with Smarter Energy Storage
With successful projects ranging from commercial buildings to large industrial facilities, IGNACORE continues to deliver scalable BESS solutions designed for Bangladesh’s evolving energy needs.
The Master Simex Paper Industry project is another milestone in IGNACORE’s commitment to providing reliable, intelligent, and high-capacity energy storage solutions for businesses and industries nationwide.