30kW/60kWh ESS Installed at 7-Storied Building in Chattogram

30kW/60kWh ESS Installed at 7-Storied Building in Chattogram

IGNACORE  |  Sep 06, 2026

IGNACORE has successfully installed and commissioned a 30kW / 60kWh Battery Energy Storage System (BESS) at a 7-storied building located on Nizam Road, Chattogram.

The project was designed to provide reliable backup power and intelligent energy management for the building, helping ensure uninterrupted operation of essential electrical loads during power interruptions.

Project Highlights

  • System Power: 30kW
  • Energy Storage Capacity: 60kWh
  • Building: 7-Storied Building
  • Location: Nizam Road, Chattogram, Bangladesh
  • System Type: Battery Energy Storage System (BESS)
  • Application: Building Backup Power & Energy Management
  • Installation Status: Successfully Installed & Commissioned

Reliable Backup Power for a Multi-Story Building

A multi-storied building depends on a stable electricity supply for essential systems and day-to-day operations. The IGNACORE 30kW / 60kWh ESS provides a powerful energy storage solution designed to maintain power continuity and support critical electrical loads when grid power is unavailable.

The system stores electrical energy and makes it available when required, providing a reliable alternative to conventional backup power solutions.

Smarter Energy Management

Beyond backup power, the IGNACORE ESS provides an efficient way to manage stored energy according to the building's operational requirements. The system helps improve power reliability while reducing dependence on conventional backup systems.

With 30kW of power output and 60kWh of energy storage, the system offers substantial energy capacity for supporting essential loads across the building.

IGNACORE Project Expertise

The successful deployment of this project demonstrates IGNACORE's ability to deliver scalable and reliable BESS solutions for residential, commercial, and multi-storied buildings across Bangladesh.

From system planning and equipment integration to installation and commissioning, IGNACORE provides end-to-end energy storage solutions tailored to each project's requirements.

Project Benefits

The 30kW / 60kWh ESS installation provides the building with:

  • Reliable backup power during grid outages
  • Support for critical electrical loads
  • Improved energy management
  • Reduced dependency on conventional backup solutions
  • Enhanced power continuity for building operations
  • A scalable and modern energy storage solution

Powering Buildings with Reliable Energy Storage

The Nizam Road project adds another successful installation to IGNACORE's growing BESS project portfolio across Bangladesh, demonstrating the company's commitment to delivering dependable and intelligent energy storage solutions for modern buildings and businesses.