IGNACORE has successfully completed the installation of a 10kW/20kWh 3-Phase Battery Energy Storage System (BESS) in Uttara, Dhaka, providing a reliable backup power solution for the building’s lift system.
The system is designed to maintain continuous lift operation during power outages, reducing dependence on conventional backup solutions and ensuring greater convenience for building occupants. With 10kW output capacity and 20kWh of battery storage, the ESS provides dependable energy backup for critical lift loads.
This successful installation in Uttara further demonstrates IGNACORE’s expertise in delivering advanced, reliable, and efficient BESS solutions for modern buildings across Bangladesh.