IGNACORE has successfully installed and commissioned a 12kW / 17kWh Battery Energy Storage System (BESS) in Narayanganj, Bangladesh, specifically designed to provide reliable backup power for the building's lift system.
The project addresses a critical requirement for uninterrupted lift operation during grid power interruptions, ensuring residents and users can continue to access the building safely and conveniently.
Project Highlights
- System Power: 12kW
- Energy Storage Capacity: 17kWh
- Location: Narayanganj, Bangladesh
- Application: Lift Backup Power
- System Type: Battery Energy Storage System (BESS)
- Installation Status: Successfully Installed & Commissioned
Reliable Power for Lift Operations
A sudden power outage can leave a lift unavailable or interrupt its operation, creating significant inconvenience for occupants of multi-storied buildings. The IGNACORE 12kW / 17kWh ESS was installed to provide dependable backup power for the lift system during grid interruptions.
The system delivers stored energy to the lift, helping maintain essential vertical transportation when the main power supply is unavailable.
Powerful Backup Without a Conventional Generator
The IGNACORE ESS provides a clean, silent, and efficient alternative to conventional generator-based backup systems.
For lift applications, fast and reliable power availability is particularly important. The ESS is designed to respond quickly to power interruptions and supply the required electrical load from its stored energy.
Project Benefits
The 12kW / 17kWh ESS provides:
- Reliable backup power for the lift
- Improved lift availability during power outages
- Fast transition to backup power
- Silent and clean operation
- Reduced dependency on diesel generators
- Lower maintenance requirements
- Reliable energy storage for building infrastructure
IGNACORE for Critical Building Loads
This project demonstrates how Battery Energy Storage Systems can be used not only for general backup power but also for specific critical loads such as lifts, pumps, lighting, security systems, and other essential building infrastructure.
With successful BESS installations across Bangladesh, IGNACORE continues to provide customized energy storage solutions based on the specific requirements of each project.
Keeping Buildings Moving When the Grid Goes Down
The successful installation of the 12kW / 17kWh ESS in Narayanganj demonstrates IGNACORE's commitment to delivering reliable, intelligent, and modern backup power solutions for critical building applications.